2Gig Takeover Switch

I want to use the 2GIG TAKE345 module to take over a DSC 1616 six zone wired system.

Does anyone have some detailed, step-by-step easy to follow instructions on how to do this?

I’d rather not pay someone to come out and do this if at all possible.

The video below shows the steps for installation and programming of the TAKE-345. The example board used in the video is actually a PC1616.

I’ve seen that video before, but I was looking for written/electronic instructions on how to do it. I’ll look it over again though.

Thanks

A detailed wiring diagram and instructions for installation are found in the product manual here. See page two at the top for a diagram showing how you would reuse the existing panel for power.